My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1999-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_1999-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 10:11:26 AM
Creation date
7/3/2020 11:08:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1999-2002
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k <br /> The Harney Lane Sanitary Landfill is located on Harney Lane approximately 7 miles east of <br /> Lodi, California (Figure 1). The site is a Class III landfill which stopped accepting waste in <br /> November 1991. A Migrant Farm Labor Camp is located adjacent to the landfill along the <br /> western boundary. The structures in the labor camp are occupied part of the year by farm <br /> workers. <br /> In accordance with closure regulations, a network of perimeter gas monitoring wells was <br /> installed by EMCON Associates in October 1991 (Figure 2). The wells are no more than <br /> 1000 feet apart and are spaced much closer than 1000 feet along the boundary with the <br /> labor camp to ensure detection of possible methane migration toward the structures. Each <br /> well contains three monitoring probes set at varying depths. The wells are monitored <br /> quarterly for methane. <br /> GAS PROBE MONITORING <br /> The County used a Landtec GEM 500 for the second quarter event on April 27, 1998. The <br /> GEM 500 was calibrated prior to monitoring by County Staff. <br /> The landfill gas flare system has been operating continuously for approximately 3 years. <br /> The County is continuing its efforts to operate the gas control system to minimize the <br /> migration of landfill gas. Table 1 shows the gas monitoring results for the second quarter <br /> of 1999. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.