My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1999-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_1999-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 10:11:26 AM
Creation date
7/3/2020 11:08:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1999-2002
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
quay <br /> COUNW OF SAN JOAQUIN <br /> THOMAS R.FLINN <br /> x DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> STEVEN WINKLER <br /> STOCKTON,CALIFORNIA 95201-1810 DEPUTY DIRECTOR <br /> 209/468-3000 <br /> FAX:209/468-2999 <br /> MANUEL LOPEZ <br /> DIRECTOR RF 0,4FIVED <br /> A P R 2 12000 <br /> EALTH <br /> April 18, 2000 PERMIT SERVICES <br /> MEMORANDUM <br /> TO: Robert McClellon, Lead Senior R.E.H.S. <br /> Public Health Services <br /> Environmental Health Division <br /> FROM: Wes Johnson ", ttle- <br /> Associate Civil Engineer <br /> SUBJECT: HARNEY LANE SANITARY LANDFILL-FINAL COVER EROSION ISSUES <br /> This is regarding our recent discussions of the erosion and settlement areas at the Harney Lane <br /> Sanitary Landfill. Currently, there are two areas of significant erosion on the side slopes at the site <br /> (see attached figure). We believe that these areas developed due to blockages in the top deck <br /> drainage ditches which prevented runoff from reaching the down drains spaced throughout the site. <br /> There are also areas of settlement on the top deck of the landfill. These areas have produced <br /> ponding water during wet weather this winter. The County performed some minor repairs prior to <br /> the wet season, but more areas must be repaired. As of approximately April 14, 2000, the site was <br /> becoming dry enough to work on the side slopes and top deck with the necessary equipment. <br /> However, recent rain has postponed our ability to work in these areas. The most significant <br /> erosion area on the west side of the primary site has been covered with plastic and sand bags to <br /> prevent further damage. <br /> The following is an anticipated schedule for all repairs, weather permitting. If you have any <br /> questions regarding this work plan, please feel free to call me at 8-3066. <br />
The URL can be used to link to this page
Your browser does not support the video tag.