Laserfiche WebLink
Mr. Gabriel Kara -I.E. -'*roject 939-01.09 <br /> November 1, 199 , <br /> Page 5 <br /> If you have any questions, please call. <br /> Very truly yours, <br /> EMCON Associates <br /> Andrew P. Wang, P.E. <br /> Senior Project Engineer <br /> I W ;'O' r -, <br /> Robert E. Van Heuit, P.E. <br /> Executive Manager <br /> Attachments: Table 1 - Gas probe construction details <br /> Table 2 - Gas probe monitoring results <br /> Figure 1 - Site location <br /> Figure 2 - Landfill gas monitoring plan <br /> Figure 3 - Multi-level probe installation <br /> Attachment A - Boring logs and well details <br /> Attachment B - GasTech calibration sheet <br /> 1 <br /> PJ9 9390109.GOW <br />