Laserfiche WebLink
f KLEINFELDER <br /> r._' TABLE OF CONTENTS <br /> Chapter Page <br /> 1 INTRODUCTION 1 <br /> 1.1 General 1 <br /> t ' 1.2 Purpose 1 <br /> 1.3 Background 2 <br /> 1.4 Definitions 3 <br /> 2 PROGRAM OVERVIEW 5 <br /> 2.1 General 5 <br /> 2.2 Regulatory Requirements 6 <br /> 2.3 Borrow Operation 7 <br /> 2.4 Barrier Layer Soil Design Mix 7 <br /> 2.5 Construction 8 <br /> 2.6 CQA Testing 8 <br /> 2.7 Engineering 9 <br /> 2.8 Field Observations 9 <br /> z 3 PROJECT ORGANIZATION 10 <br /> 3.1 Organization Chart 10 <br /> 3.2 Outline of Responsibilities 10 <br /> 3.2.1 Project Administrator 10 <br /> 3.2.2 Project Manager 10 <br /> 3.2.3 Engineer of Record 10 <br /> 3.2.4 Survey Team 11 <br /> - 3.2.5 Construction Monitor, Support Engineers 11 <br /> 3.2,6 Field Engineer 12 <br /> 3.2.7 Quality Control Technicians 12 <br /> 3.2.8 Construction Forces 13 <br /> 3.3 Professional Qualifications 13 <br /> 3.3.1 General Professional Qualifications 13 <br /> 3.3.2 Project Team Qualifications 14 <br /> 4 SOIL BORROW 15 <br /> f 4.1 Borrow Investigation 15 <br /> E 4.2 Operations 15 <br /> 4.2.1 Construction Methods 15 <br /> 4.2.2 Control 15 <br /> 5 CONSTRUCTION CONTROL 16 <br /> 5.1 Stoppage of Work 16 <br /> 5.2 Grade Control 16 <br /> 5.3 Quality Control 17 <br /> 6 CONSTRUCTION 18 <br /> 6.1 Test Pad 18 <br /> 6.2 Construction of the Final Cover 18 <br /> 6.2.1 Foundation Layer 18 <br /> CR9-42 Page iii of iv <br /> vi Copyright 1991 Kleinfelder, Inc. <br />