Laserfiche WebLink
11.0 ESTIMATED CLOSURE COST SUMMARY <br /> 1. FINAL COVER $ 905, 079 <br /> 2 . CONSTRUCTION QUALITY ASSURANCE 160, 000 <br /> 3 . REVEGETATION 153 , 000 <br /> 4 . GAS CONTROL SYSTEM 400, 000 <br /> 5. GAS MONITORING 10, 000 <br /> 5. LEACHATE CONTROL SYSTEM 0 <br /> 6. GROUNDWATER MONITORING 0* <br /> 7. DRAINAGE SYSTEM 30,800 <br /> 8. SECURITY MEASURES 11,500 <br /> 9. STRUCTURE REMOVAL 3,500 <br /> 10. DISMANTLE ENVIRONMENTAL 0 <br /> CONTROL SYSTEMS <br /> TOTAL $1,673,879 <br /> 20% CONTINGENCY $ 334,775 <br /> (Per 14 CCR 18263 (a) (5) ) <br /> TOTAL CLOSURE COST $2, 008,654 <br /> * A contract has already been awarded to EMCON Associates to <br /> perform ground water and surface water monitoring. The funds <br /> for this contract are available from the Solid Waste <br /> Enterprise fund. Therefore, no cost is shown for ground water <br /> monitoring for the closure period. <br /> 23 <br />