Laserfiche WebLink
'LU'O-*'G 'OF EXPLORATORY BORING <br /> PROJECT NUMBER 939-01.01 BORING NO. MW-3 <br /> PROJECT NAME Harney Lane Sanitary Landfill PAGE 3 OF 8 <br /> BY BAB DATE 3/27-3/28/87 SURFACE ELEV. 95.80 <br /> POCKET PENETRA- H LITHO- <br /> TORVANE PENETRO- TION z u, GRAPHIC <br /> METERW w x a DESCRIPTION <br /> (Blows/ 3 J W < COLUMN <br /> (TSF) (TSF) Ft.) v c vi <br /> i <br /> 40 CL SILTY CLAY (continued). <br /> sand and silty sand interbeds in- <br /> crease. <br /> 4 varies to clayey silt. <br /> 5 <br /> 55 <br /> 6 <br /> REMARKS <br /> Very poor sample recovery 50-65 feet. <br /> PLATE 21 <br />