My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 7:08:21 AM
Creation date
7/3/2020 11:08:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994_1
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
665
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix C <br /> SAMPLING AND ANALYSIS PROCEDURES <br /> 4 <br /> INTRODUCTION <br /> This appendix presents the sampling and analysis procedures used by <br /> k EMCON Associates during the sampling event conducted at the Harney <br /> Lane Sanitary Landfill in May 1987. Four ground-water monitoring <br /> wells installed by EMCON and five existing private wells were sampled <br /> for chemical analysis (see Figure 3 of the report) . The private wells <br /> were sampled on May 11, 1987, and the four EMCON-installed monitoring <br /> wells (MW-1, MW-2, MW-3, and MW-4) were sampled on May 12 and 13, <br /> 1987. <br /> A <br /> GROUND-WATER SAMPLING AND ANALYSIS PLAN <br /> The following Procedures are provided so that <br /> (1) consistent and re- <br /> producible methods are used to obtain samples from monitoring wells <br /> and (2) proper analyses are performed on the samples. Parameters cho- <br /> sen for analysis were those presented in the monitoring plan prepared <br /> in 1986 by J.H. Kleinfelder & Associates. <br /> The sampling procedures used were based on: <br /> ® Procedures Manual for Ground-Water Monitoring at Solid <br /> Waste Disposal Facilities (EPA/530/SW-611, August 1977) <br /> • Test Methods for Evaluatij39 Solid Waste; Physical/ <br /> Chemical Methods (U.S. EPA SW-846, November 1986, 3rd <br /> Edition) <br /> The procedures and techniques listed below are described in the fol- <br /> lowing sections: <br /> I • Sample collection <br /> • Sample shipment <br /> PJ9 9390102.000 - C-1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.