My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 7:08:21 AM
Creation date
7/3/2020 11:08:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994_1
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
665
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pertinent field information recorded during the monitoring program at <br /> Wells MW-1 through MW-4 are given in Table C-1. <br /> Private Well Sampling <br /> Five existing private wells (the landfill water supply, Sawyer, Hall , <br /> v Whittaker, and Goehring wells) were sampled on May 11, 1987, for water <br /> quality analysis. The procedures used to sample the private wells are <br /> very similar to those used to sample the "MW" series monitoring wells. <br /> Prior to sampling the private wells, depth to water measurements were <br /> recorded at the Sawyer, Goehring, and landfill water supply wells. <br /> The Whittaker and Hall wells could not be accessed at the well source; <br /> therefore, no depth to water measurements were taken at these wells. <br /> Samples from each of therivate wells were collected <br /> P as close to the <br /> well head as possible. Since all of the private wells were in opera- <br /> tion, extended purging prior to sampling was not required. However, <br /> the water in the plumbing and water storage tank was evacuated prior <br /> to obtaining samples. Samples were collected directly from the well <br /> source into the appropriately preserved bottles for the analyses to be <br /> performed. Private well samples were not filtered. Table C-2 pre- <br /> sents depth to water information and descriptions of sampling loca- <br /> tions for each private well sampled. All procedures described in this <br /> s document for the EMCON-installed monitoring wells in the equipment <br /> cleaning, sample preservation, sample shipment, analytical procedures, <br /> and chain-of-custody control sections were also observed for private <br /> well sampling. <br /> Sample Preservation <br /> Sample preservation varied with each type of analytical parameter. <br /> Selected container types and materials were nonreactive with the <br /> sample and the particular analytical parameter tested. Sample vol - <br /> umes, sample containers, and preservatives used during the monitoring <br /> PJ9 9390102.00D C-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.