Laserfiche WebLink
LOG OF EXPLORATORY BOW <br /> PROJECT NUMBER 939-01.09 <br /> BORING NO. GW-9 <br /> PROJECT NAME Barney Lane Landfill PAGE 3 OF 3 <br /> BY L. Gallagher DATE 10/8/91 SURFACE ELEV. ft. <br /> W LITHO- WELL <br /> a GRAPHICDESCRIPTION DETAIL <br /> W COLI94N <br /> J 'moi N <br /> SAMY CLAY (CL), continued. <br /> @40': 10-15% gravel; 20-30% sand; 60-65% <br /> moderate-plasticity fines. <br /> BORING TERMINATED AT 44 - <br /> 45 <br /> 50 <br /> 55 _ <br /> 60 <br /> REWARKS <br /> Ar "ft <br /> Boring drilled with 6-inch-diameter solid flight augers. Boring converted to a 0.5-inch-M PVC Tri-level Gas <br /> Probe. Logged from drill cuttings. <br /> O <br />