My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 7:08:21 AM
Creation date
7/3/2020 11:08:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994_1
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
665
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
qtr. Gabriel Karam -3- 18 October 1993 <br /> The County must do the following: <br /> 1. Verify that the foundation layer for the primary and secondary landfills meets the required <br /> standard for relative compaction of 90%. <br /> 2. Remove SP/SM material so that appropriate depth of liner material can be placed for final <br /> cover. The entire test pad should be removed so that the final cap can be constructed in a <br /> continuous manner. <br /> 3. Provide a copy of the compaction curves. The compaction curves were not submitted with <br /> the report. <br /> 4. Submit documentation which demonstrates that there is enough ML material available onsite <br /> to construct the final cover. If the County determines that there is not enough ML material, <br /> the County must provide an alternate material. This material must be tested and any <br /> associated costs must be reflected in a revised closure plan. <br /> 5. Construct another test pad using the same methods and materials that the County will use in <br /> the final cap or conduct field permeability tests on the final cap after it is completed. A <br /> vegetative layer may be placed on the final cap while it is being tested, but may have to be <br /> removed if the cap fails and the clay barrier layer has to be reworked to meet construction <br /> requirements. <br /> If you have any questions, please contact me at (916) 255-3136. <br /> R®BE4RTAV. � S <br /> Project Engineer <br /> RAE <br /> cc: Wes Mindermann, California Integrated Waste management Board, Sacramento <br /> Ed Padilla, San Joaquin County Public Health Services, Stockton <br /> Ron Heinzen, Kleinfelder, Inc., Stockton <br /> _ r <br /> a-. <br />
The URL can be used to link to this page
Your browser does not support the video tag.