Laserfiche WebLink
LOG OF EXPLORATORY BORING <br /> PROJECT NUMBER 939-01.09 BORING NO. GW-5 <br /> PROJECT NAME Harney Lane Landfill PAGE 2 OF 2 <br /> BY L. Gallagher DATE 10/9/91 SURFACE ELEV. ft. <br /> (n LITHO- <br /> �++ WE <br /> -J GRAPHIC DESCRIPTION DET. <br /> <C COLUMN <br /> SANDY CLAY (CL), continued. <br /> . . . . SAND TO SILTY SAND (SP-SI), olive yellow <br /> • (2.5Y, 6/8); 3-5% very coarse sand; 82-85% <br /> fine to medium sand, subangular to <br /> 25 : : : subrounded; 10-15% low-plasticity fines; damp. <br /> 30— @30': trace pebbles (<5mm-diameter). <br /> BORING TERMINATED AT 33 FEET. <br /> 35 <br /> 40 <br /> SSS <br /> Boring drilled with 5-inch-diameter solid flight augers. Boring converted to a 0.5-inch-M PVC Tri-level Gas <br /> Probe. Logged from drill cuttings. <br /> E.M 0N <br />