My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:54:32 AM
Creation date
7/3/2020 11:08:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
meet all CIWMB closure regulations . <br /> The drainage system consists of a system of 12" diameter Corrugated <br /> Metal Pipe (CMP) overside conduits, earthen "V" and trapezoidal <br /> profile ditches, and two detention basins. Final grades for the <br /> top surface of the landfill were constructed to a minimum slope of <br /> three percent as required by the regulations. Storm water runoff <br /> from the top of the landfill and the maintenance road is directed <br /> to the perimeter drainage ditch that encircles the top of the <br /> landfill . The drainage ditch is typically graded at 0 . 2 percent <br /> toward downdrains located approximately every 400 feet around the <br /> landfill. The downdrain pipes convey the runoff to the lower <br /> perimeter ditch system, which in turn conveys the water to one of <br /> the detention basins. <br /> The lower perimeter ditch system around the primary site conveys <br /> storm water runoff to the southwest corner of the primary site, at <br /> which point a culvert carries the water over the East Bay Municipal <br /> Utilities District (EBMUD) aqueducts to the main storm water <br /> detention basin. The lower perimeter ditch system around the <br /> secondary site conveys storm water runoff to the auxiliary storm <br /> water detention basin. Water in the auxiliary detention basin is <br /> pumped into the drainage channel leading into the main detention <br /> basin as necessary. Water collected in the main storm water <br /> detention basin is automatically pumped as necessary, into South <br /> Paddy Creek just south of the basin by float controlled pumps. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.