Laserfiche WebLink
File No. 20-1008-49 <br /> December 22, 1994 <br /> 0 Page 16 of 21 <br /> SUMMARY OF FIELD DENSITY TEST RESULTS <br /> Depth From Dry Laboratory Specified <br /> Test Finished Moisture Density Compaction Relative Relative <br /> No. Date Test Location Subgrade(ft.) %Dry Wt. P.C.P. Curve No. Compaction Compaction <br /> BARRIER LAYER <br /> 540 9-19 N2780 E1902 -1.0 13.6 119 43 98 95 <br /> 541 9-19 N3125 E1925 -1.0 14.4 117 42 99 95 <br /> 542 9-19 N3125 E1975 -1.0 15.2 115 42 98 95 <br /> 543 9-19 N3375 E1950 -1.0 15.2 116 42 98 95 <br /> 544 9-20 N1395 E1802 -1.0 14.2 114 47 98 95 <br /> 545 9-20 N1410 E1840 -1.0 14.8 114 47 98 95 <br /> 546 9-20 N1460 E1850 -1.0 11.2 122 44 96 95 <br /> 547 9-20 N1490 E1820 -1.0 15.3 114 45 97 95 <br /> 548 9-20 N1520 E1805 -1.0 11.4 120 39 95 95 <br /> 549 9-20 N1530 E1820 -1.0 15.0 117 47 99 95 <br /> 550 9-20 N1575 E1840 -1.0 13.9 117 47 100 95 <br /> 551 9-20 N1625 E1810 -1.0 13.6 114 47 98 95 <br /> 552 9-20 N1680 E1850 -1.0 11.9 121 44 96 95 <br /> 553 9-20 N1725 E1860 -1.0 14.8 114 45 97 95 <br /> 554 9-20 N1740 E1850 -1.0 14.9 117 45 99 95 <br /> 9-20 N1790 E1810 -1.0 13.2 119 43 97 95 <br /> 9-20 N1800 E1803 -1.0 12.4 121 43 99 95 <br /> 557 9-20 N1825 E1825 -1.0 15.2 116 47 99 95 <br /> 558 9-20 N1850 E1850 -1.0 12.5 116 47 99 95 <br /> 559 9-20 N1875 E1875 -1.0 13.4 117 47 100 95 <br /> 560 9-20 N1975 E1860 -1.0 11.3 121 39 96 95 <br /> 561 9-20 N2050 E1825 -1.0 15.2 115 42 98 95 <br /> 562 9-20 N2100 E1840 -1.0 13.4 117 46 98 95 <br /> 563 9-20 N2175 E1805 -1.0 13.2 118 46 99 95 <br /> 564 9-20 N2225 E1850 -1.0 14.6 116 47 99 95 <br /> 565 9-20 N2290 E1890 -1.0 14.7 115 47 98 95 <br /> 566 9-20 N2290 E1890 -1.5 16.1 112 47 96 95 <br /> 567 9-20 N2350 E1875 -1.0 16.4 114 41 96 95 <br /> 568 9-20 N2450 E1880 -1.0 14.0 116 47 99 95 <br /> 569 9-20 N2525 E1850 -1.0 10.8 122 39 97 95 <br /> 570 9-20 N2550 E1825 -1.0 16.4 114 41 96 95 <br /> 571 9-20 N2560 E1885 -1.0 13.8 117 46 98 95 <br /> 572 9-20 N2660 E1870 -1.0 15.1 116 45 98 95 <br /> 573 9-20 N2620 E1850 -1.0 14.5 117 45 99 95 <br /> 574 9-20 N2675 E1805 -1.0 12.6 119 46 99 95 <br /> 575 9-20 N2720 E1802 -1.0 13.2 118 46 99 95 <br /> 576 9-20 N2750 E1850 -1.0 14.4 112 47 96 95 <br /> 9-20 N2850 E1850 -1.0 12.6 119 46 99 95 <br /> Accepted engineering and testing procedures were used for these tests. The above data is presented for information purposes only. In the absence of continuous observations of our personnel <br /> at the site,we cannot express an opinion as to the adequacy of site preparation or overall fill compaction. We do not undertake the guarantee of construction,nor do we relieve the contractor <br /> of his primary responsibility to produce a completed project conforming to the project plans and specifications. Copyright 1994 Kleinfelder,Inc. <br />