File No. 20-1008-49 <br /> December 22, 1994 <br /> Page 21 of 21 <br /> SUMMARY OF FIELD DENSITY TEST RESULTS <br /> Depth From Dry Laboratory Specified <br /> Test Finished Moisture Density Compaction Relative Relative <br /> No. Date Test Location Subarade(ft.) %Dry Wt P.C.P. Curve No. Compaction Comyaction <br /> BARRIER LAYER <br /> SC-17 9-12 N2240 E2390 -2.0 12.1 122.2 32 98 95 <br /> SC-18 9-12 N2480 E2460 -2.0 14.5 121.8 14 96 95 <br /> SC-19 9-13 N3350 E2350 -2.0 12.3 117.3 33 99 95 <br /> SC-20 9-13 N1250 E2325 -2.0 12.3 122.6 32 98 95 <br /> SC-21 9-14 N950 E2225 -2.0 14.5 114.0 24 96 95 <br /> SC-22 9-14 N2375 E2250 -2.0 14.0 116.8 36 96 95 <br /> SC-23 9-15 N3125 E2180 -2.0 15.1 116.6 37 97 95 <br /> SC-24 9-15 N1170 E2110 -2.0 11.7 124.2 13 97 95 <br /> SC-25 9-15 N2400 E2125 -2.0 11.6 118.6 29 96 95 <br /> SC-26 9-16 N1175 E2050 -2.0 9.9 126.2 44 100 95 <br /> SC-27 9-16 N1950 E2025 -2.0 13.4 116.8 43 96 95 <br /> SC-28 9-16 N3050 E2075 -2.0 18.2 111.4 35 99 95 <br /> SC-29 9-19 N1875 E1925 -2.0 13.7 116.4 40 97 95 <br /> SC-30 9-19 N1201 E1955 -2.0 12.8 119.8 43 98 95 <br /> SC-31 9-21 N2275 E1805 -2.0 15.4 117.2 45 99 95 <br /> 2 9-21 N1925 E1850 -2.0 15.2 117.1 48 97 95 <br /> SW13 9-21 N3100 E1675 -2.0 15.2 114.5 49 98 95 <br /> SC-34 9-21 N1250 E1705 -2.0 14.0 121.8 36 99 95 <br /> SC-35 9-21 N2890 E1750 -2.0 13.8 118.5 40 98 95 <br /> SC-36 9-21 N1875 E1860 -2.0 11.9 121.1 44 96 95 <br /> BARRIER LAYER - SLOPE <br /> SC-37 10-14 N3050 E3150 -2.0 16.5 101.6 50 92 90 <br /> SC-38 10-14 N875 E2210 -2.0 15.9 103.7 52 90 90 <br /> SC-39 10-19 N3350 E1600 -2.0 17.1 104.3 50 95 90 <br /> Accepted engineering and testing procedures were used for these tests. The above data is presented for information purposes only. In the absence of continuous observations of our personnel <br /> at the site,we cannot express an opinion as to the adequacy of site preparation or overall fill compaction. We do not undertake the guarantee of construction,nor do we relieve the contractor <br /> of his primary responsibility to produce a completed project conforming to the project plans and specifications. Copyright 1994 Kleinfelder,Inc. <br />