My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2005-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_2005-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 11:03:37 AM
Creation date
7/3/2020 11:09:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2005-2007
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_2005-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM -9- <br /> ARNEY LANE SANITARY LANDFILL <br /> SAN JOAQUIN COUNTY <br /> 4. Points of Compliance <br /> The points of compliance for around water shall be Monitoring`;ells MW-2, MW-3 and <br /> X,W-4. The point of compliance for surface water shall be monitoring point S-2. MW-4 <br /> is not a compliance well for chloride, TDS, and EC concentrations due to the possibility <br /> of interference from the sewage disposal ponds located directly upgradient. <br /> 5. Compliance Period <br /> The Compliance Period is the number of years equal to the active life of the waste <br /> management plus the closure period. Each time the Water Quality Protection Standard is <br /> exceeded (i.e., a release is discovered), the landfill begins a Compliance Period on the <br /> date the Board directs the Discharger to begin an Evaluation Monitoring Program. If the <br /> Discharger's Corrective Action Program(CAP) has not achieved compliance with the <br /> Standard by the scheduled end of the Compliance Period, the Compliance Period is <br /> automatically extended until the landfill has been in continuous compliance for at least <br /> three consecutive years. <br /> Statistical Procedures for Determining Significant Increases <br /> The significance of increases in indicator parameters and waste constituents over water quality <br /> protection standards shall be established through the use of the statistical procedures in §2555.7 <br /> of Chapter 15. 1 T,owever, since V OC's have been sporadically detected in MW-2, concentration <br /> limits for moniterinj parameters should be"no statistically significant increasing trends". <br /> The Discharaer shall implement the above monitoring program on the effective date of this <br /> Order. <br /> Ordered b . • <br /> Y <br /> WILLIAM K CROOKS, Executive Officer <br /> 3 Mav 1996 <br /> (Date) <br /> GAI:kas:njs <br /> Amended.3 May 1996 <br />
The URL can be used to link to this page
Your browser does not support the video tag.