Laserfiche WebLink
Job 07200096.01 <br /> Second Quarter 2005 <br /> Table 2. Structure Roof Vent Monitoring <br /> Harney Lane Landfill Site <br /> Measurements Made April 14, 2005 <br /> Methane Gas* Oxygen Gas* <br /> Location/Description Time % LEL [%-Vol] Remarks <br /> Structure 1 13:50 ND 20.9 <br /> Structure 2 13:53 ND 20.9 <br /> Structure 3 13:58 ND 20.9 <br /> Structure 4 14:02 ND 20.9 <br /> Structure 5 14:05 ND 20.9 <br /> Structure 6 14:08 ND 20.9 <br /> Structure 7 14:12 ND 20.9 <br /> Structure 8 14:15 ND 20.9 <br /> Structure 9 14:17 ND 20.9 <br /> Structure 10 14:20 ND 20.9 <br /> Structure 11 14:25 ND 20.9 <br /> Structure 12 14:28 ND 20.9 <br /> Structure 13 14:32 ND 20.9 <br /> Technician/Meteorological Conditions <br /> 04/14/05 Technicians- K. Shannon/J. Edgar, Temperature-64, Barometric pressure-30.0, Weather- Clear, Wind - 5-10 mph <br /> ND=None Detected <br /> %-LEL= Percent Lower Explosive Limit <br />