My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2010-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 12:33:43 PM
Creation date
7/3/2020 11:09:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2010-2011
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 4 <br /> the near vicinity, but away from the installed well and existing fence. <br /> After the ramp is removed, the chain link fence needs to be re-constructed. Please let me <br /> know when your crew may be able to schedule this work. <br /> Thanks <br /> JOYESH CHANDRA <br /> SAN JOAQUIN COUNTY <br /> PUBLIC WORKS DEPARTMENT <br /> SOLID WASTE DIVISION <br /> PH: (209) 468-3066 <br /> Fax: (209) 468-3078 <br /> From: Joyesh Chandra <br /> Sent: Wednesday, May 05, 2010 12:28 PM <br /> To: Robert Kelley <br /> Cc: Michael Carroll; bwaddle; Marcus Davenport; Jaime Perez; Dan Johnson <br /> Subject: Pad Const for MW-5 @ Harney Lane Landfill <br /> Hello Robert <br /> As we had discussed over the phone, our division would like your division's crew to help us in <br /> earthmoving work involved in our upcoming groundwater well installation project. Due to <br /> current site conditions, a drill rig access ramp needs to be built to one of the proposed well <br /> locations north of the Landfill's secondary site and near the wastewater treatment ponds. The <br /> ramp construction will involve the following tasks: <br /> • Removing about 16LF of existing fence for ramp construction <br /> • Placing fill soil in the area to build the drill rig access ramp. Your crew may use the fill <br /> soil at the site or bring fill soil from work areas. <br /> • Building a pad for the drill rig near the well location <br /> • Compacting the ramp and the drill pad <br /> • Removing the ramp after the completion of the well installation project. <br /> • Re installing the fence <br /> As discussed, I can meet your crew and discuss the scope of work tentatively on Friday <br /> May 7th at 8.00 am. After our brief meeting, we can then begin construction. As you had <br /> mentioned, building the ramp may take 3 working days. Please use Job # 750032 for this <br /> work. Do let me know if you need any additional info. <br /> Regards <br /> JOYESH CHANDRA <br /> SAN JOAQUIN COUNTY <br /> PUBLIC WORKS DEPARTMENT <br /> SOLID WASTE DIVISION <br /> 1810 E. HAZELTON AVE <br /> 6/23/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.