My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2010-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 12:33:43 PM
Creation date
7/3/2020 11:09:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2010-2011
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. The Contractor shall cease grouting when the cement level has risen to two <br /> feet from the ground surface. Cement levels shall be monitored by the <br /> Contractor to assure that cement taken into the formation is replaced by <br /> additional cement. <br /> J. Allow eight hours between placing neat cement grout and concrete pad <br /> material. <br /> K. The Contractor shall record the following information on the Driller's Log: <br /> 1. Depth of encountered water-bearing zones <br /> 2. Total depth of bore hole <br /> 3. Depth from ground surface to top and bottom of the well screen interval <br /> 4. Depth from ground surface to top of the sand pack interval <br /> 5. Depth from ground surface to top of the bentonite plug <br /> 6. Height above the ground surface of the top of the well casing <br /> 7. Height above the ground surface of the top of the steel protective <br /> casing <br /> 3.04 WELL SURFACE COMPLETION <br /> A. Install the well enclosure and bollards plumb. <br /> B. Clean the enclosure and spot paint scrapes. <br /> PART 4 WELL RE-DEVELOPMENT <br /> Existing groundwater monitoring well shall be re-developed. As built well <br /> logs and drilling logs of MW-2 is available upon request. The Contractor <br /> shall identify the method of well re-development to the County. All <br /> wastewater shall be drained as directed by the Contractor. <br /> PART 5 MEASUREMENT AND PAYMENT <br /> Payment shall be full compensation for labor, materials, tools, equipment <br /> overhead. Unless authorized in writing by the Engineer, the quantity paid <br /> shall not exceed the amount shown on the proposal. <br /> 5.01 MOBILIZATION/DEMOBILIZATION <br /> Mobilization/demobilization includes, bringing workers, equipment, and <br /> material to the sites, and removing such equipment and material when the <br /> work is complete. <br /> Construction Specifications San Joaquin County <br /> Groundwater Monitoring Wells Page 8 of 9 Public Works Dept <br /> Revised 11-23-09 Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.