Laserfiche WebLink
Page 1 of 1 <br /> Natalia Subbotnikova [EH] <br /> From: Joyesh Chandra [Jchandra@sjgov.org] <br /> Sent: Thursday, May 13, 2010 2:03 PM <br /> To: Natalia Subbotnikova [EH] <br /> Cc: Robert McClellon [EH]; Michael Carroll; Marcus Davenport; Jaime Perez <br /> Subject: Well installation project At Harney Lane& North County Landfill <br /> Hello Natalia <br /> We would like to confirm the work schedule for our planned well installation project at Harney Lane and <br /> North County Landfill. The project schedule as mentioned before will be from May24th to June 8th, <br /> 2010. This schedule includes groundwater (GW)well installation work at both sites and the installation <br /> of two new shallow LFG migration monitoring wells at North County. <br /> We have tentatively planned to start work at Harney lane first. Due to the nature of drilling work, well <br /> installation inspection times scheduled with your department are tentative. We anticipate our drilling <br /> contractor will be ready for the first well inspection around 2 pm on May 25th. We will call and confirm <br /> the first inspection date and time after 12.00 pm on May 24th. It is our understanding that your <br /> department is available for inspection from 9.00am to 3.30pm. Consecutive inspections needed for the <br /> project will be scheduled with your department on site after the first inspection. <br /> Our consultant, Vector Engineering, will also be on-site to log the wells as they are installed. If you <br /> need any additional information, please call me at the phone number below. <br /> Thanks <br /> JOYESH CHANDRA <br /> SAN JOAQUIN COUNTY <br /> PUBLIC WORKS DEPARTMENT <br /> SOLID WASTE DIVISION <br /> 1810 E. HAZELTON AVE <br /> STOCKTON, CA 95201 <br /> PH: (209) 468-3066 <br /> FAX: (209) 468-3078 <br /> Email:ichandraosigov.org <br /> 5/13/2010 <br />