My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2010-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 12:33:43 PM
Creation date
7/3/2020 11:09:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2010-2011
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> Natalia Subbotnikova [EH] <br /> From: Joyesh Chandra [Jchandra@sjgov.org] <br /> Sent: Thursday, May 13, 2010 2:03 PM <br /> To: Natalia Subbotnikova [EH] <br /> Cc: Robert McClellon [EH]; Michael Carroll; Marcus Davenport; Jaime Perez <br /> Subject: Well installation project At Harney Lane& North County Landfill <br /> Hello Natalia <br /> We would like to confirm the work schedule for our planned well installation project at Harney Lane and <br /> North County Landfill. The project schedule as mentioned before will be from May24th to June 8th, <br /> 2010. This schedule includes groundwater (GW)well installation work at both sites and the installation <br /> of two new shallow LFG migration monitoring wells at North County. <br /> We have tentatively planned to start work at Harney lane first. Due to the nature of drilling work, well <br /> installation inspection times scheduled with your department are tentative. We anticipate our drilling <br /> contractor will be ready for the first well inspection around 2 pm on May 25th. We will call and confirm <br /> the first inspection date and time after 12.00 pm on May 24th. It is our understanding that your <br /> department is available for inspection from 9.00am to 3.30pm. Consecutive inspections needed for the <br /> project will be scheduled with your department on site after the first inspection. <br /> Our consultant, Vector Engineering, will also be on-site to log the wells as they are installed. If you <br /> need any additional information, please call me at the phone number below. <br /> Thanks <br /> JOYESH CHANDRA <br /> SAN JOAQUIN COUNTY <br /> PUBLIC WORKS DEPARTMENT <br /> SOLID WASTE DIVISION <br /> 1810 E. HAZELTON AVE <br /> STOCKTON, CA 95201 <br /> PH: (209) 468-3066 <br /> FAX: (209) 468-3078 <br /> Email:ichandraosigov.org <br /> 5/13/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.