Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2009-0049 -21- <br /> SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br /> HARNEY LANE LANDFILL <br /> SAN JOAQUIN COUNTY <br /> last report was submitted, and if the violations were corrected. If no violations <br /> have occurred since the last submittal, this shall be stated in the transmittal letter. <br /> The transmittal letter shall also state that a discussion of any violations found <br /> since the last report was submitted, and a description of the actions taken or <br /> planned for correcting those violations, including any references to previously <br /> submitted time schedules, is contained in the accompanying report. <br /> 6. Each monitoring report shall include a compliance evaluation summary. The <br /> summary shall contain at least: <br /> a. For each monitoring point and background monitoring point addressed by the <br /> report, a description of: <br /> i. The time of water level measurement; <br /> ii. The type of pump - or other device - used for purging and the elevation of <br /> the pump intake relative to the elevation of the screened interval; <br /> iii: The method of purging-(the-pumping rate; the-equipment-and--methods <br /> used to monitor field pH, temperature, and conductivity during purging; the <br /> calibration of the field equipment; results of the pH, temperature, <br /> conductivity, and turbidity testing; and the method of disposing of the <br /> purge water) to remove all portions of the water that was in the well bore <br /> while the sample was being taken-, <br /> iv. The type of pump - or other device - used for sampling, if different than <br /> the pump or device used for purging; and <br /> v. A statement that the sampling procedure was conducted in accordance <br /> with the approved Sampling and Analysis Plan. <br /> b. A map or aerial photograph showing the locations of observation stations, <br /> monitoring points, and background monitoring points. <br /> c. For each groundwater body, a description and graphical presentation of the <br /> gradient and direction of groundwater flow under/around the Unit, and the <br /> groundwater flow rate, based upon water level elevations taken prior to the <br /> collection of the water quality data submitted in the report. <br /> d. Laboratory statements of results of all analyses evaluating compliance with <br /> requirements. <br /> e. An evaluation of the effectiveness of the leachate monitoring and control <br /> facilities, and of the run-off/run-on control facilities. <br /> f. A summary and certification of completion of all Standard Observations for <br /> the Unit(s), for the perimeter of the Unit, and for the receiving waters. The <br /> Standard Observations shall include: <br /> i. For the Unit- <br /> 1) Evidence-of_pcnded-w-aterat_any_point on-theJacflity_(show affected <br /> area on map); <br />