Laserfiche WebLink
MONITORING AND REPORTING PROGRAM ORDER NO. R5-2009-0049 -5- <br /> SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br /> HARNEY LANE LANDFILL <br /> SAN JOAQUIN COUNTY <br /> Landfill Interval Location Sample Type Monitoring Points <br /> 1 Middle Perimeter Monitoring GW-9M, GW-10D <br /> 1 Deep In situ Extraction East header <br /> 2 Deep In situ Extraction East or west header <br /> The LFG monitoring points shall also include, for a given monitoring period, any <br /> perimeter gas well that exceeds 5 percent methane by volume during that period, <br /> as measured under the perimeter migration monitoring program required by the <br /> Local Enforcement Agency. <br /> 2. Monitoring Parameters & Schedule <br /> The LFG monitoring parameters shall be as follows: <br /> Parameter Units Frequency Method <br /> Gas Pressure In. w.c.' Quarterly Meter <br /> Methane % Quarterly Meter <br /> Carbon Dioxide % Quarterly Meter <br /> VOCs' ppbv Semiannually EPA Method TO-15 <br /> or 82606 <br /> 1. Inches water column. <br /> Field meters shall be calibrated for each parameter before use. Field and <br /> calibration logs for each monitoring event shall be included in each monitoring <br /> report. <br /> E. GROUNDWATER MONITORING <br /> 1. Elevation Monitoring (Section 2041 (e)(13)) <br /> The groundwater surface elevation (in feet and hundredths, MSL) in all wells and <br /> piezometers shall be measured on a quarterly basis. Groundwater elevations <br /> taken prior to purging the well and sampling for Monitoring Parameters may be <br /> used to fulfill this requirement. Groundwater elevations for all monitoring wells for <br /> a given groundwater body shall be measured within a period of time short <br /> enough to avoid temporal variations in groundwater flow which could preclude <br /> accurate determination of groundwater gradient and direction. The results of <br /> groundwater elevation monitoring shall be displayed on a water table contour <br /> map and/or groundwater flow net for the site and included in each monitoring <br /> report. <br /> The Discharger shall use the groundwater elevation monitoring data to estimate <br /> the following, as feasible: <br />