Laserfiche WebLink
f MONITORING WELL PURGING PROTOCOL <br /> MEASURE AND RECORD DEPTH TO WATER AND <br /> WELL TOTAL DEPTH <br /> OT <br /> CALCULATE PURGE VOLUME BY <br /> USING THE FOLLOWING EQUATION: <br /> P=n r2h x 7.48 x 3 <br /> where: <br /> P=calculated purge volume(gallons) <br /> it=3.14 <br /> r=radius of well casing in feet <br /> h=height of water column in feet <br /> --T- <br /> EVACUATE WATER FROM WELL EQUAL TO <br /> THE CALCULATED PURGE VOLUME WHILE <br /> MONITORING GROUNDWATER <br /> STABILIZATION INDICATOR PARAMETERS <br /> (pH,CONDUCTIVITY,TEMPERATURE)AT <br /> INTERVALS OF ONE CASING VOLUME. <br /> WELL EVACUATED To PRACTICAL Ll[MITS <br /> OF DRYNESS BEFORE REMOVING <br /> CALCULATED PURGE VOLUME <br /> NO YES <br /> FINAL TWO SETS OF GROUNDWATER <br /> STABILIZATION INDICATOR PARAMETER <br /> MEASUREMENTS MEET THE FOLLOWING <br /> CRITERIA; WELL RECHARGES TO A LEVEL <br /> pH =1 0.1 pH units SUFFICIENT FOR SAMPLE <br /> COND. =�IO% COLLECTION WITHIN 24 HOURS <br /> TEMP, =±1.0'F OF EVACUATION TO DRYNESS. <br /> YES NO J:1 ENOD <br /> WELL PURGING CONTINUE PURGING;EVACUATE FIELD TEST FIRST RECORD WELL <br /> CRITERIA MET; ADDITIONAL CASING VOLUME RECHARGE WATERFOR ASDRY FOR <br /> PROCEED TO OF WATER,MONITORING INDICATOR PARAMETERS, PURPOSES OF <br /> WELL SAMPLING. INDICATOR PARAMETERS FOR THEN PROCEED TO WELL SAMPLING. <br /> STABILITY. SAMPLING. <br /> FIGURE� <br /> EMCON MONITORING WELL PURGING PROTOCOL A-1 <br />