My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 2:36:30 AM
Creation date
7/3/2020 11:09:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2012
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Shaw Environmental <br /> GROUNDWATER SAMPLING AND ANALYSIS REQUEST FORM <br /> PROJECT NAME: Harney Lane Landfill, <br /> San Joaquin County <br /> SCHEDULED DATE: July 30,2012 <br /> SPECIAL INSTRUCTIONS/CONSIDERATI Project Mngr: JC Isham <br /> Semi-Annual 2012 Groundwater Montorin st&3rd-Qtrs) `� ' Sacto Dir Ph: 916-565-4316 <br /> 3rd Qtr 2012 Surface Water. Concord Dir: 925-288-2381 <br /> Project No.: 139866.17 <br /> Sampler: Paul Weinhardt <br /> Cell: 530-391-4037 <br /> f Well Lock <br /> Number(s) <br /> fr <br /> Well Number C g Casing Depth to / <br /> or Source Dieter ength, � Water ANALYSIS REQUESTED <br /> (inc es) t (feet) <br /> 5 <br /> S-1 VOCs by 8260B <br /> (Upstream of landfill) TDS,Chloride, <br /> Total Alkalinity,Total Hardness,COD <br /> S-2 <br /> (Downstream of landfill) <br /> ADD 1st Qtr: Bicarbonate, <br /> Nitrate-Nitrogen(48-hr HOLD),Sulfate <br /> Ca,Mg,K,Na(Not field filtered) <br /> Field Measurements: <br /> pH,Temp,Turbidity,DO,ORP(Redox),EC <br /> Laboratory and Lab QC Instructions: <br /> BC Labs-Tina Green Please report MDL's,PQL's,&Trace. <br /> 4100 Atlas Court BC Lab Courier: <br /> Bakersfield,Ca 93308 Ross Dickey @ 661-201-4171 <br /> 661-327-4911/Fx:327-1918 <br /> UPS Acct 965376 <br /> Harney 1 st,3rd Qtrs 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.