Laserfiche WebLink
a <br /> Shaw En onmentaI <br /> GROUNDWATER SAMP G AND SIS REQ ORM <br /> PROJECT NAME: Harney Lane Landfil <br /> SCHEDULED DATE: October 8,2012 <br /> SPECIAL INSTRUCTIONS/CONSIDERAT NS : Proje gr: JC Isham <br /> Ground Water Levels only 2nd&4th Quarte s. Sacto r Ph: 916-565-4316 <br /> 4th Quarter 2012 ��] Co ord Dir: 925-288-2381 <br /> Project No.: 139866` /A!�o <br /> Sampler: Paul Weinhardt <br /> Cell: 530-391-4037 <br /> Well Lock <br /> Number(s) <br /> Notify Mike Carroll prior to monitoring event. 0464 <br /> Phone(209)468-8504 Or via E-mail<mcarroll@sjgov.org> <br /> Well Number `Casing Casing Depth to <br /> or Source Diameter Length Water ANALYSES REQUESTEDk <br /> inches (feet) feet <br /> 7/30/2012 DTWs on all wells. <br /> �,V. <br /> MW-1 4.5 150.0 137.75 DTW measurements for all wells. <br /> MW-2 4.5 143.0 132.72 <br /> MW-3 4.5 137.0 1031.70 <br /> (Old TD 144.2,QED pumps stuck at bottom of well 8/26/09) <br /> (New pump installed,set at 136.50 Feb 2010) <br /> MW-4 4.5 135.8 130.82 <br /> MW-5 2.0 145.4 129.44 <br /> MW-6 3.0 150.1 133.18 <br /> Laboratory and Lab QC Instructions <br /> Harney 2nd,4th Qtrs 1 of 2 <br />