My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3242
>
4400 - Solid Waste Program
>
PR0440068
>
COMPLIANCE INFO_1993-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2021 2:45:06 PM
Creation date
7/3/2020 11:10:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-2007
RECORD_ID
PR0440068
PE
4434
FACILITY_ID
FA0001871
FACILITY_NAME
CALIFORNIA CLAY LANDFILL
STREET_NUMBER
3242
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17702029
CURRENT_STATUS
02
SITE_LOCATION
3242 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440068_3242 S EL DORADO_1993-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[A <br />aUHlE«Au <br />VERITAS <br />Mr. Victor Izzo <br />RWQCB — Central Valley Region <br />May 31, 2006 <br />Page 5 of 5 <br />Clayton Project No. 80-03242.00.500 <br />If you have any questions or comments, please contact either Andrew Keller at 310-831-0281 or <br />Jeffrey Bennett at 714-431-4152. <br />Sincerely, �C �O AL <br />AWREY <br />e <br />�` No <br />� <br />/effreyD. Bennett, PG, Cger, Geosciences and <br />Los Angeles Regional Office OF Fo <br />Cc: Andrew Keller — Cove Contractors <br />Randy Friedlander - CIWMB <br />Rebecca lingman <br />Consultant <br />Los Angeles Regional Office <br />Enclosures: Figure 1 Site Vicinity Map <br />Figure 2 Existing Groundwater Monitoring Well Network <br />SOP -3 Decontamination of Field Equipment <br />SOP -5 Monitoring Well Installation <br />SOP -6 Groundwater Well Development and Surveying <br />SOP -7 Groundwater Sampling <br />SOP -8 Acquisition and Interpretation of Water -Level Data <br />SOP -9 Field Measurement of pH, Conductivity, and Temperature of <br />Surface Water and Groundwater <br />SOP -10 Destruction of Monitoring Wells <br />S:\ES\Proi\P03242\Groundwater\Workplan 2006\GW_installation and abandonment_WPL_FINAL.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.