My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3242
>
4400 - Solid Waste Program
>
PR0440068
>
COMPLIANCE INFO_1993-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2021 2:45:06 PM
Creation date
7/3/2020 11:10:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-2007
RECORD_ID
PR0440068
PE
4434
FACILITY_ID
FA0001871
FACILITY_NAME
CALIFORNIA CLAY LANDFILL
STREET_NUMBER
3242
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17702029
CURRENT_STATUS
02
SITE_LOCATION
3242 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440068_3242 S EL DORADO_1993-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />k"KLEI N FELDER f; 1:44 <br />August 9, 1994 <br />File: 24-215600-H00 <br />Ms. Carol Oz <br />San Joaquin County PH-EHS <br />P.O. Box 2009 <br />Stockton, CA 95201 <br />Subject: Cove Contractors Landfill <br />San Joaquin County, California <br />Dear Ms. Oz: <br />During our telephone conversation last Tuesday, I said I would provide you with a schedule for <br />submission of a Closure and Postclosure Maintenance Plan (CPCMP) for the Cove Contractors <br />Landfill. In a letter from Kleinfelder to you, dated April 29, 1994, I included two tables (a list of <br />applicable sections of Article 7.8 of Title 14 and a proposed Table of Contents for the Closure <br />and Postclosure Maintenance Plan). I understand from our conversation that preparing the <br />CPCMP in accordance with those tables will be acceptable. Preparation of the CPCMP will <br />require approximately eight weeks. Cove Contractors will submit the CPCMP on October 10, <br />1994. <br />You may not be aware that a new regulator has been assigned to the project at the CVRWQCB, <br />Ms. Gail Wigget (Robert Evans was transferred to Cal -EPA). Over the next few weeks <br />Ms. Wiggett will be reviewing the project files to gain a familiarity with the Cove Contractors <br />Landfill. She may then request changes or additions to the CPCMP that could change the <br />proposed submission date of October 10. In spite of this uncertainty, we will make every effort to <br />hold to our proposed schedule. <br />Please contact me if you have any questions or require additional information. <br />Sincerely, <br />KLEINFELDER, INC. <br />Timothy A. Crandall, P.E. <br />Project Engineer <br />TAC:tic <br />cc: Jack Hecht, Learner Construction <br />Gail Wiggett, Central Valley Regional Water Quality Control Board <br />CL5-38 (1994) <br />Copyri ht 1994 Kleinfelder, Inc. <br />KLEINFELDER 3077 Fite Circle, Sacramento, CA 95827 (916) 366-1701 <br />
The URL can be used to link to this page
Your browser does not support the video tag.