Laserfiche WebLink
E <br />Table 2 <br />Proposed Table of Contents <br />Final Closure and Postclosure Maintenance Plan <br />Cove Contractors Landfill <br />I-1 Executive Summary <br />I-2 Background <br />I-2.1 Location, Site Characteristics and Ownership <br />I-2.1.1 Location <br />I-2.1.2 Topography and Geology <br />I-2.1.3 Groundwater Hydrology <br />I-2.1.4 Ownership <br />I-2.2 Operational History <br />I-2.2.1 Fill Sequencing <br />I-2.2.2 Waste Composition <br />I-2.2.3 Current Condition <br />I-2.3 Summary of Environmental Status <br />I-2.3.1 Groundwater <br />I-2.3.2 Surface Water <br />I-2.3.3 Vadose Zone <br />I-2.3.4 Landfill Gas <br />I-3 Regulatory Compliance <br />I-3.1 California Integrated Waste Management Board <br />I-3.2 Central Valley Regional Water Quality Control Board <br />II -1 <br />Closure Design <br />II -1.1 <br />Cap Structure <br />II -1.1.1 <br />Engineered Alternative <br />II -1.1.2 <br />Foundation Layer <br />II -1.1.3 <br />Barrier Layer <br />II -1.1.4 <br />Vegetative Layer <br />II -1.2 <br />Settlement <br />II -1.2.1 <br />Estimated Future Settlement <br />II -1.2.2 <br />Measurement of Future Settlement <br />II -1.3 <br />Closure Contours <br />II -1.4 <br />Drainage <br />II -1.5 <br />Slope Stability <br />II -1.5.1 <br />Background <br />24-215600-H00/CL4-13 (1994) Page 5 of 6 <br />April 29, 1994 <br />