8 SCHEDULE <br /> Miller Brooks will install the off-site monitoring wells prior to the end of the first quarter 2008 <br /> reporting period and results will be included in the first quarter groundwater monitoring report. <br /> Monitoring well installation will be contingent on approval of the Central Valley RWQCB, <br /> subcontractor scheduling, and permitting. All fieldwork is expected to require approximately <br /> one week; however, groundwater sampling cannot be conducted until 48 hours after the wells <br /> have been developed. The first quarter report will be submitted to the Central Valley RWQCB <br /> by April 31,2008. <br /> 12 �AMLLEN BRavus <br /> P:\707 Cove Contractors\WDR\Tech Report and WP 2008\Tech Report and WP_FINAL.doc <br />