Laserfiche WebLink
• i <br /> 12 SPILL CONTAINMENT <br /> In the event a spill occurs on-Site, the field personnel will immediately isolate the area by <br /> delineating the area with cones and/or caution tape. The spill will be cleaned up and the <br /> impacted material will be excavated and appropriately containerized. Confirmation samples <br /> will be collected to verify that all impacted material has been removed, and, if necessary, <br /> additional material will be excavated and the area will subsequently be resampled. The <br /> containerized material will also be sampled and profiled for disposal and subsequently <br /> transported off-Site to the appropriate facility, depending on the analytical results. For specific <br /> requirements regarding the handling of drums and containers, additional information is provided <br /> in 8 CCR 5192(j). <br /> 27 l!f®GEEK/�fl K <br /> ?mac <br /> P:\707 Cove Contractors\Groundwater\Well Installation Workplans\SHSP\SHSP_FINAL.doc <br />