My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3242
>
4400 - Solid Waste Program
>
PR0440068
>
COMPLIANCE INFO_2008-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2021 10:05:03 AM
Creation date
7/3/2020 11:10:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2017
RECORD_ID
PR0440068
PE
4434
FACILITY_ID
FA0001871
FACILITY_NAME
CALIFORNIA CLAY LANDFILL
STREET_NUMBER
3242
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17702029
CURRENT_STATUS
02
SITE_LOCATION
3242 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440068_3242 S EL DORADO_2008-2017.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A -3- <br /> MONITORING WELL WORKPLAN AND REPORT REQUIREMENTS <br /> SECTION 2 -Monitoring Well Installation g2port <br /> The monitoring well installation report must provide the information listed below. In addition, the report <br /> must also clearly identify, describe, and justify any deviations from the approved workplan. <br /> A. General Information <br /> 1. Purpose of the well installation project, <br /> 2. Brief description of local geologic and hydrogeologic conditions encountered during <br /> installation of the wells, <br /> 3. Number of monitoring wells installed and copies of County Well Construction Permits, <br /> 4. Topographic map showing facility location, roads, surface water bodies, <br /> 5. Scaled site map showing all previously existing wells, newly installed wells, surface <br /> water bodies, buildings, waste handling facilities, utilities, and other major physical and <br /> man-made features. <br /> B. Drilling Details—Narrative and Graphic <br /> 1. On-site supervision of drilling and well installation activities, <br /> 2. Drilling contractor and driller's name, <br /> 3. Description of drilling equipment and techniques, <br /> 4. Equipment decontamination procedures, <br /> 5. Soil sampling intervals and logging methods, <br /> 6. Well boring log: <br /> a. Well boring number and date drilled <br /> b. Borehole diameter and total depth <br /> C. Total depth of open hole (same as total depth drilled if no caving or back-grouting <br /> occurs) <br /> d. Depth to first encountered groundwater and stabilized groundwater depth <br /> e. Detailed description of soils encountered, using ASTM D2488-93 Method for <br /> Visual Classification, Standard Practice for Description and Identification of Soils <br /> (Visual-Manual Procedure) for Field Work. <br /> C. Well Construction Details—Diagram and Narrative <br /> 1.Well construction details <br /> a. Well number, date started, date completed, geologist's name <br /> b. Total depth drilled <br /> C. Drilling Contractor and driller name and address <br /> d. Depth of open hole (same as total depth drilled if no caving occurs) <br /> e. Method and materials of grouting excess borehole <br /> f. Footage of hole collapsed <br /> g. Length of slotted casing installed <br /> h. Depth of bottom of casing <br /> i. Depth to top of sand pack <br /> j. Thickness of sand pack <br /> k. Depth to top of bentonite seal <br /> 1. Thickness of bentonite seal <br /> M. Thickness of concrete grout <br />
The URL can be used to link to this page
Your browser does not support the video tag.