• <br /> B. ORIGINAL WELL CONSRUCTION DETAILS <br /> B.1 Well Numbers and Dates of Installation <br /> MW-7 was installed in August 1988 (See Appendix A). <br /> B.2 Diagram with Well Construction Details <br /> Groundwater was encountered at approximately 30 feet bgs during the installation of MW-7. The <br /> well is constructed of 2-inch schedule 40 PVC casing with 0.010 slot size screen. Additional, well <br /> construction details for MW-7 are provided in Appendix A. <br /> B.3 Boring Logs <br /> The total depth of the boring for MW-7 was approximately 40 feet bgs. The lithology information <br /> associated with MW-7 is provided on the boring log in Appendix A. <br /> MW Abandonment Workplan MW-7 Stockton,Ca <br /> Cove Contractors,Inc. 4 Project No.04.20090407.00 <br />