Laserfiche WebLink
The Scotts Company Linden. C <br /> Ungrounded Green Waste Temperatures <br /> Temp <br /> Tons Trucks/ <br /> 13 1 4 1 5 6 7 8 Received day f 2005 <br /> Date <br /> 1 Grinding Today 58.91 6 <br /> 2 Finish Grinding Today 24.79 1 <br /> 3 30.86 2 <br /> 4 18.3 2 ` �® <br /> 5 <br /> 6 �� S <br /> 7 21.03 2 a� <br /> 19.62 2 <br /> 72 80 70 66 72 82 66 72 22.14 2 <br /> 10 78 80 92 98 82 94 78 82 27.1 2 <br /> 11 72 90 94 82 96 100 98 72 <br /> 1 <br /> 13 <br /> 14 Starting Grinding Today <br /> 1 <br /> 16 Finish Grinding Today <br /> 17 <br /> 18 <br /> 19 keel flasto <br /> 20 6 <br /> 21 1 <br /> 22 70 72 66 80 72 84 78 90 32.66 2 <br /> 23 80 86 70 80 72 66 78 94 27.76 2 <br /> 24 90 92 70 82 66 72 76 80 24.67 2 <br /> 25 70 66 70 82 94 90 84 78 10.26 1 <br /> 26 <br /> 27 <br /> 28 66 72 66 70 82 78 92 80 36.27 2 <br /> 29 <br /> 30 <br /> N31 <br /> Total This month 295. 22 Finished Compost <br />