Laserfiche WebLink
DIRECTIONS FOR FILLING OUT CI.WMB-93 FORM <br /> Fill out inspection#carni cconap letely, Inspection Tirne,'I'irlie In,ane:Tone Out are optional. Mark the;lines to the right ofeach a�fa-1 leas of rc:,�s rls,t,,to indicate one of the <br /> following: <br /> V =Violation A=Area of`Concern Nth v Not Applicab;c <br /> surrarlrari e inspection result,in the l'OM.' ENIFFTS scctacan_ Ifadditional space is re glared use:t€�rrlt WIS-03, Include explanations for determinations of N/A+vixen <br /> appropriaw.Check form(s)for c€om plet:enesslaecuracy and submit to the C idit"orina Intigrat 'A"aste Management Board within 30 days of the inspeetio€)in accordance <br /> with 3€1 PRC 43218. <br /> TAKIIIAL SUMMARY OF APPLICABLE LA ANI. REGULATIONS <br /> Consult Title 14.California C".cede of Regulations,arid the,Public.Resources,Code for tine complete lases mill regulations listed on this Poseur, <br /> rR i9 2_The€peraric)n of a€solid waste.3heility byany person,£acs pt as-aauthorized pursuant to a solid waste f aciliti,:pernait issued by the EA: is prohibited, <br /> >Pi C_44914(lr«fte permit shall contah)all€cans and conditions_ssaluch the ISA determines to be approprriate for the opet€ation of the solid waste facility; The operator <br /> shall comply with all terms and conditions of the permit <br /> ElkC,4400 iso significant change in design or operation except in conformance with approved solid waste facilities permit(5WFf"). Application filed with LEA for <br /> modifications in design or operation of facility at least 1.20 days in advance of date proposed modification to take place, <br /> 17856fc)� gricultural material composting operation Which uses agricultural commodities and clean gran material shall not sell or give-'way more,than 1,0()0 cubic-yards <br /> of compost per year. {rote:17856(h)states,"C'«mp€est produced by an agricultural material composting,operation ixtu h uses only agricultural commodities may he sold <br /> or given away withc ut restriction' <br /> ''j <br /> T f3-C:omposting tacility that requires a standardized or full SW `1'shall tile,art RC'SI ccith the Itis' if the pocrrnitted feedstock is aftet ad,the A must be notified, <br /> j'7S65fa 4)perations and finalities located atop closed landf ills Jiall meet poste loc;ure land use requiretrients: U o1wations arae#facilities sited on inlerroedi ate cover shall <br /> locate operations areas on foundatioil substrate haat is stabilized. <br /> 178 6-Operations aaad fauilitiia shallttl�designed so that the operational requirements its rticle 6 can be compiled with,designed by engineers and other professiom&, <br /> design based lira appropriate data,and the design of a facility which requires is Standardized or lull Pernui shall accompany tile..RC"SI: <br /> i.'781-�Opt rations and facilities shall: a, not process Inarnrnals;except from residential sector or flood service industry: f_a)tZp nrinitnize vectors,odors,litter,hazards, <br /> nuisances,:noise.and(lust,particulates and pathogens:JLa)Q)conduct random load checks for contranInants;(a)f-4)prevent contamination of compost that has Undergone <br /> p}atht)gera reduction with materials that have not; Cr)prevent unautho razed human or animal:Access;1�� 1 contr€l traffic#hies,and ��(At3St lc gibiC slgilS at al��7tl�lii _ <br /> entrances. Srsatts shall include the name of the operation or facility,to nae of the toperalor,facility hours of operation,inaterials that will or will not be accepted(if. <br /> applicable.).schedule,of charges(if applicablei�and phone number where operator cats be real;#led in case of-emergency, Ob Facilities shall provide fire prevention, <br /> protection,ars§control measures,including temperature monitoring of windrows,adequate water:sripply,isolation orpotential ignition sources,from comb.ustibte materials, <br /> a f"srelane of 12 feet'at rninirrium,and telephone or radia communication, <br /> L78_—Operations that sell or give assay greaten than 2,511{}cubic yards of compost annually and all facilities shall:'take and analyze a€omposite sample of cornpc=4t <br /> product...in the manner indicated in this section,to verify that metal concentration limits'are not exceeded and pathogen reduction requirements have been naet. An <br /> operator who composts green material,animal material,or rinsed solid waste.shall take and analyze one:composite sample for every 5,000 cubic-yards of compost <br /> produced.An operator who composts sewage sludge shall meet the sampling schedule described it)Table 1 of this;section. <br /> 7 is 2-C?oatp test Product that exceeds the,maximum acceptable metal concentrations shall be designated f€}r disposal,additional processing,or other use its approved by <br /> the appropriate,agencies <br /> l'fll o <br /> a-Compost ost product that exceeds the:maxianurn acceptable pathogen concentrations shall he designates,'for disposal,additional processing,or other use as <br /> approved by the ap propriate agencies. h 1 Heal coliform-iia compost shall be less than 1.000 Most Psobaabte Number per grain of total solids(dry weight basis)or the <br /> density of Salmone:llaa sp.bacteria shall be lass than three(3)Most Probable Number per four(4)granas of total solids. Enclosed or wathinh s-ess�pli ritions tend <br /> foci itisj>shall maintain compost at a temperature of 55 degrees Celsius(131 degrees Fahrenheit)or higher for a pathogen reduction period of 3 days and LbJ 2 Asubmit <br /> a systern-specific temperature monitoring plan with the pe:rtrut a`app7lication to meet these requirements. fl?J U3 IVittdCOL4 C(7iYIp7CfStillC-dacti3'C CO1T3pE4'+t allele bit ITl-1 talltCt'1 <br /> under aerobic conditions Lit a temperature of 5:s degrees Celsius or higher for a pathogen reduction period of 15 days. During this period,the:windrows shall be turned a <br /> minimum of five(5)times. ;p), Aerate;el stacica npie-all active compost shall be covered with t"it)12 inches of insulating material and maintained ata temperature of 55 <br /> degrees Celsius fcor`aa pathogen reduction period of 3 days. fe Alternative methods aof'pathogen reduction may be approved by the,EA if the EA determines that the <br /> ahernatiVe method will provide pathogen reduction equiv atent to this.ection. d�Monitoring-Each daffy daring the pathogen reduction period,at least one,temperature <br /> reading shalt be taken every 150 feet of windrow or every 200 cubic-yards of active compost.or fraction thereof. Windrows and agitated bays shall be monitored 12 to 24 <br /> inches below the pile surface. Aerated static pips shall be monitored 12 to 18 inches from the print cohere the in'a€lation cover mieets the active compost, <br /> 7&bN 4 Fe:ed-stock is considered clean green material if the following-are met:(a)feedstock undergoes load cheeling to ensure physical contaminants are no greater than <br /> 0.5 percent of total weight,including visual.observation:of incoming waste loads and load sorting to quantity the percentage of contaiminautms;load sorting shall be <br /> performed on a minimum of rine percent,of daily incoming material_volume and number of vehicle loads,or at least one truck per day.whichever is greater;(b)the;metal <br /> concentration limits of Section 17868,2 are not_exceedctl;Lel facility personnel are adequately trained to perform these activities;(d)agricultural material composting <br /> operations obtain records demonstrating compliance with this Section. in accordance with 17852(k),'(Clean Green Material"must be processed by a permitted solid <br /> waste facility,to reduce contamination and include tree,and landscape trimming materials that have never been combined with other waste materials. Note:Th..clean green <br /> material portion can not exceed tete agricultural commodities portion of active compost o❑-site anlauitlly fear aericulturaal ntateixal c oinposting c grei<ations, <br /> X78_ f-Operations and facilities shall: keep records in one accessible luxation for 5 years.LbI record special occurrences(including methods to resolve problems arising <br /> from these events and details of incidents that required emergency proceduresi, 1 record public complaints received by the operator(including mature of complaint;date.. <br /> complaint was received;name,address.and telephone number ofcornplainaam.and any acti6n4'tauten to respond tea the complaint),fAl record the quantity and type of <br /> feedstock received and quantity of compost produced,Lel record the number of load checks per£ormed,atnd loads rejected,.(f)..'Tecord all test results resulting froan� <br /> compliance with,article 2,including metal concentrauioiis,fecal coliform and Salmonella sp,densities,temperature measurements balsa dates cif windrow turnings;and <br /> re twin recaords detailing paths%gen reduction methods. <br /> 17V-0-0perations and facilities shall: )provide the EAwritten notice of i€tern to perforin site restoration,at least 30 days prior to beginning restoration,(Iju:provide site <br /> restoration nes:ezrsary to protect public health,safety.and the environments(g)ensure that the site restoration procedures Mailed in this Section are performed upon <br /> completion of operations and termination of service. <br /> Ig213_Ub'-permit review application submitted by o no less than 12C)days before S F`P is due for review, <br /> asn 98 10175 <br />