Laserfiche WebLink
WASTE PILE <br /> TEMPERATURE CONTROL <br /> PROCEDURE <br /> Se <br /> ...ptembLr2, 2003 <br /> As <br /> of September 2, 2003, the green waste pile will be turned at least <br /> three times daily to keep the green waste pile temperature under 122 degrees <br /> Fahrenheit. <br /> A temperature check will be done once a day at the hottest point of the <br /> day to assure the green waste pile is kept under 122 degrees Fahrenheit. <br /> An activity log will be kept in the Scale House to keep track of the <br /> times the green waste pile was turned and temperature of the green waste <br /> pile for each day. <br /> The green waste loader operator will be responsible for taking the <br /> temperature of the green waste pile daily. If the loader operator is not <br /> available the lead transfer station person will be responsible for taking the <br /> temperature. <br />