My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOLLY
>
20500
>
4400 - Solid Waste Program
>
PR0541297
>
COMPLIANCE INFO_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2026 11:47:39 AM
Creation date
7/3/2020 11:12:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2017
RECORD_ID
PR0541297
PE
4443
FACILITY_ID
FA0023658
FACILITY_NAME
GREEN EARTH RECOVERY
STREET_NUMBER
20500
STREET_NAME
HOLLY
STREET_TYPE
DR
City
TRACY
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
20500 HOLLY DR
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4443_PR0541297_20500 HOLLY_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Complaint re -inspection <br />Green Earth Recovery <br />November 10, 2016 <br />Notes: <br />• Measurements were taken of all piles of material on site. Facility has approximately 12694 cubic <br />yards of material on site. Reduce amount of material to 12500 or less. <br />• Material removed from the property that will be land applied must meet all requirements of Title <br />14 CCR Section 17852(a)(24.5)(A). <br />• Facility plans to obtain a full solid waste facility permit in order to store more than 12500 cubic <br />yards of material on site. Facility must notify EBD 180 days prior to making any <br />• Submit an Odor Impact Management Plan to EHD. <br />• Submit an Operation Plan to EBD. <br />• All treated waste must be removed from the piles and placed in a container for removal. <br />• Facility must make application to EHD 180 days prior to expanding its operation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.