Laserfiche WebLink
1. Second phase of NRF (44,000 square feet). <br /> 2. New office building (to be built in 1995) to be 12,000 square feet. <br /> 3. New maintenance shop (to be built in 1996)to be 10,000 square feet. <br /> The following additional equipment will be contained within the 44,000-square- <br /> foot NRF expansion building addition as indicated on Figure 5. <br /> A. New baler for recyclable material. <br /> B. Amfab refuse compactor. <br /> C. Conveyors for material sorting. <br /> D. Conveyor for wood processing. <br /> E. Wood grinder. <br /> 8 Revised: July 1995 <br />