My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1333
>
4400 - Solid Waste Program
>
PR0440009
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 2:58:00 AM
Creation date
7/3/2020 11:13:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995
RECORD_ID
PR0440009
PE
4445
FACILITY_ID
FA0000428
FACILITY_NAME
CENTRAL VALLEY WASTE SERVICES
STREET_NUMBER
1333
Direction
E
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
SEE COMMENTS
CURRENT_STATUS
01
SITE_LOCATION
1333 E TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0440009_1333 E TURNER_1995.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 8) Fire suppression - On site fire hydrants and hoses are available to put out any <br /> i possible fires. All areas of the premises and each piece of equipment has a fire <br /> extinguisher and the Lodi Fire Department is available if needed. <br /> 9) Dust - The facility is paved to prevent dust generation. The incoming material <br /> may be misted if necessary to minimize dust. <br /> iThe supply of material to be processed is anticipated to be 50,000 tons annually. The <br /> supply includes leaves, yard and garden waste, food processing waste, grape pumice and <br /> grape stems. Exact volumes of each type of material are variable, however, residential <br /> 1 yard and garden waste will make up the majority of the material to be composted. The <br /> balance of materials will be from the commercial and residential gardeners and low <br /> volume wood waste producers (such as construction and cabinet makers). The flow of <br /> the material is expected to be static at 160 tons per day, five to seven days per week. <br /> No sludge or liquid waste will be used in the compost process. <br /> 1 <br /> i <br /> 1 <br /> 1 <br /> i <br /> 1 <br /> s9-18211112RosU 17 <br /> Jamary 1992 <br />
The URL can be used to link to this page
Your browser does not support the video tag.