Laserfiche WebLink
MIMI M ! r M M M M M M MM MIM M rIMI <br /> TABLE 1-1 <br /> SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES <br /> Significance <br /> Before Significance <br /> Potential Impact Mitigation Mitigation Measures After <br /> Measures Mitigation <br /> Measures <br /> rating and that conform to adopted Building Code <br /> Fire Safety Standards for all of the uses proposed <br /> within the project area. <br /> Project Effects on Fire Protection Services PS 1. The ODS shall pay Public Facility Fees to defray LS <br /> capital facilities costs associated with expanding law <br /> enforcement <br /> 2. The ODS shall have the entire construction site <br /> monitored, fenced and inaccessible to the public <br /> after hours, and on weekends and holidays until the <br /> site is operating. The fence shall be well maintained <br /> as needed during the project. <br /> 3. The ODS shall have the entire construction area <br /> well lighted throughout the night, every night, during <br /> construction, so as to clearly illuminate the project <br /> area. <br /> 4. Project landscaping along the building exterior and <br /> parking areas shall be maintained as required to <br /> facilitate adequate visibility to support law <br /> enforcement. <br /> Project Impacts on Schools and Other Public NI None required <br /> Facilities <br /> 14. RECREATION <br /> Project Impacts on Recreation LS None required <br /> 15. TRANSPORTATION/CIRCULATION: <br /> Traffic Impacts of the Project PS 1. The ODS shall define and construct any necessary LS <br /> improvements, including parking, street <br /> improvements, striping and signage modifications <br /> 121339/ST01 1 R226 1-12 October 14, 2011 <br /> Copyright 2011 Kleinfelder / <br /> KLEINF-ELDER <br /> Bright People.Right Solutions. <br />