Laserfiche WebLink
6. Physical Factors: <br /> a. Soil suitability (for projects involving construction) <br /> The site soils are suitable for the proposed construction. <br /> b. Degree of flood protection <br /> The property lies in Zone X, as shown in Panel 0603020020D 2/4/8 <br /> C. Public or man-made waterways existing on or abutting site <br /> Mormon Slough abuts the north edge of the site at Lincoln St. <br /> 7. Biological Factors: <br /> a. Locations, size, species and number of trees to be removed. <br /> List rare or endangered flora or fauna and significant <br /> wildlife habitat found on or near the site. <br /> No trees will be removed and no rare or endangered flora or <br /> fauna or any significant wildlife habitat are known to exist . <br /> CERTIFICATION: I hereby certify that the statements furnished above and in <br /> the attached exhibits present the data and information required for this <br /> initial evaluation to the best of my ability, and that the facts, statements, <br /> and information presented are true and correct to the best of my knowledge <br /> and belief. - <br /> Date C/7 <br /> 4f n a t u r e) <br /> Date <br /> (Signature) <br /> ----------------------------------------------------------------------------- <br /> (FOR STAFF USE ONLY) <br /> C. Environmental Impacts: ( See Attachment to Initial Study for Additional <br /> Information) <br /> 1. Will the project create adverse impacts on the following public <br /> facilities and utilities? . If yes is checked, further explanation <br /> is necessary. <br /> YES NO <br /> a. Solid Waste <br /> b. Water Supply <br /> C. Liquid Waste <br /> d. Storm Water ✓ <br /> e. Gas and Electric ✓ <br /> f. other Urban Services ✓ <br /> -3- <br />