Laserfiche WebLink
9 9 : FROM I NTEGRATED WASTE BDTO91209464013B P.05 <br />SCH # 92092072;w <br />Lovelace Transfer-ttation Expansion Projec <br />Page <br />on October 22, 1952, Board staff submitted comments to assist the <br />lead i ' n preparation of the / In that <br />linerBoard staff requested that the lead agency contact the Regional <br />Water Quality Control Board (MCB), Ceztral Valley Region, for <br />requirements forrr arras Board staff <br />reiterate our original rv♦ est that the lead agencyho' #: <br />contactrµ Regional Water Quality Control Board (RWWB), <br />Valley Region, to discuss impacts with solid waste extraction and <br />the potential for elevated water quality parameters and the . <br />impacts upon water quality as a result of the proposed project <br />The Draft EIR indicated that water quality mitigation measures <br />involved monitoring of the retention pond water and would <br />mitigate qualityr_ _ to a levelof r t k <br />mitigationBoard staff concur that the retention pond monitoring is a <br />but measure is limited to the retention <br />pond and may not .. as an effective mitigation measure <br />for <br />groundwater monitoring beneath the site. <br />An area designated for Household Hazardous Waste (HEM) will <br />receive i1sed batteries, latex paint, waste oil, and <br />antifreeze. it is planned to handle- <br />Landfill.currently done at the North County Recycling Center and <br />Sanitary #r - waste will ultimately <br />disposed of at a licensed facility or tranaported to <br />appropriate facilities - <br />If• of previously disposed material# ! expose <br />and site employees to health and safety impacts. Employee health <br />x ► safety protection measurwell potential d <br />construction personnel and r-; /'" public should be paramount <br />publicin the establishment of the fac Please identify worker and <br />::: protection w'.. £ s r': sitesafety plan and Table <br />2.1 in the,Final <br />FT <br />Although the occurrence of a spill or accident involving HM <br />the site may be rare, Board staff request that a general <br />description of the load checking program be identified in the <br />Final EIR. in addition, Board staff request the Final EIR <br />include the following,. I <br />A -description of hazardous materials required and hazardous <br />wastes generated during project.implementation. <br />A di scussion of public information procedures which indicate <br />the accepted and excluded materials for retrieval at the <br />