k%J KLEINFELDER <br /> File No._204W-bl <br /> January 7, 1993 <br /> We recommend that all foundation excavations on th'' project be observed by a representative <br /> of our firm prior to placement of reinforcing steel 'i the excavations. The purpose of the <br /> observations is to confirm that the soils actually encOLintered in the foundation ex.;avations are <br /> the same as those on which our recommendations are based, and to observe for any extremely <br /> loose pockets of soil. <br /> Lateral EMMM <br /> Resistance to lateral forces can be provided either by friction between the base of the <br /> foundations and the soil or by passive pressure of the sides of the foundations against the soil. <br /> The recommended coefficient of friction is 0.4. The recommended passive soil pressure is <br /> an equivalent fluid pressure of 350 psf per foot of depth. Active pressures for use in the <br /> design of retaining walls can be based on an active pressure of 35 pounds per square foot <br /> (psf)/ft. of depth. If walls are considered rigid and not free to deflect, an at-rest pressure of <br /> 60 psf/ft. should be considered. <br /> Floor Slabs <br /> We recommend that floor slabs be underlain by a minimum of 6 inches of recompacted <br /> existing soil or by Engineered Fill. The recommended minimum degree of compaction is 90 <br /> percent of the maximum dry density as determined by the ASTM D-1557 test procedure, at <br /> a moisture content near optimum. In our opinion, a capillary moisture break, such as <br /> provided by a layer of gravel or coarse sand beneath floor slabs, can be omitted in areas not <br /> to receive moisture-sensitive floor coverings due to the sandy nature of the near-surface soils. <br /> In areas to receive moisture-sensitive floor coverings, we recommend that the subgrade soils <br /> be covered by a moistureproofing membrane such as "Moiststop," or equivalent, to act as a <br /> vapor barrier. Care should be exercised to avoid tearing, ripping, or displacing the <br /> membrane during construction. If the membrane becomes tom or dismrbed, it should be <br /> removed and patched, or completely replaced. The membrane should be covered with <br /> approximately 1 inch of moist sand to protect it during construction and to aid in curing the <br /> concrete. <br /> For floor slabs that will not contain heavy storage or equipment loads, we recommend that <br /> the floor slabs be a minimum of 4 inches in thickness and be reinforced with at least wire <br /> mesh placed at midpoint in the slabs. For floor slabs that will contain heavy loads, thicker <br /> on the order of 5 to 6 inches may be required. The actual floor slab thickness and reinforcing <br /> design should be provided by the structural engineer. <br /> Site Preparation and Grad ng <br /> Site preparation should include the stripping and removal of all concrete and asphalt <br /> pavement, vegetation and debris from the areas of construction. The stripped vegetation and <br /> debris should not be incorporated in any of the structural fills. The actual depth of stripping <br /> should be determined in the field by a representative of our firm. Voids left by the removal <br /> Copyright 1993 MeinfeLder, Inc. Page 6 of 11 <br />