Laserfiche WebLink
is <br /> 2.6.2 Commercial Route <br /> The refuse collectors use the "commercial" lane and stop at the "commercial" scale. They are <br /> weighed loaded before proceeding to the Commercial Disposal Area. After unloading they leave <br /> the station using the west exit. No additional weighing is necessary since the tare weight of these <br /> vehicles is recorded in the computer system. When new vehicles are put in service, they must <br /> return to the "commercial" scale and be weighed empty to obtain the tare weight. <br /> Other occasional users of the Commercial Disposal Area may include vehicles from the general <br /> public with large loads, as directed by the attendant, as well as the overflow of"public" vehicles <br /> during weekend peak hours. <br /> 2.6.3 Transfer Route <br /> The transfer trailers will use the "transfer" lane and proceed to the Transfer Tunnel for loading. <br /> They are weighed at the "transfer" scale and leave the station using the west exit. <br /> 2.6.4 Recycling Route <br /> The general public with loads of recyclable materials that have been separated at the source will <br /> stop at the "public" gate and then proceed to the Recycling Drop-Off Area for unloading. <br /> The vehicles that transport the recyclable materials to market are the only "non-public" vehicles <br /> allowed to use the "public" lanes. These vehicles stop at the "public" gate for identification and <br /> then proceed to the recycling areas for loading. They are weighed in the Recycling Area before <br /> leaving the station using the east exit. <br /> 2.7 CONSTRUCTION PHASING <br /> Construction of the!00 facility will be phased to allow for uninterrupted operation of the <br /> existing facility and Wsmooth transition after the new facility is completed. <br /> The following is a schematic construction sequence: <br /> 2.7.1 Phase 1 <br /> Construction of Transfer Building, Recycling Area Retention Pond Fuel Station and roadways <br /> west of the existing station. Construction of Scale House, scale pits, and new entrance road <br /> north of the existing station. Temporary enlargement of existing drainage pond. <br /> C-14 <br />