Laserfiche WebLink
Page 1 of 1 <br />lau <br />From: Jaime Perez Uperez@sjgov.org] <br />Sent: Friday, November 12, 2010 9:10 AM <br />To: Natalia Subbotnikova [EH] <br />Cc: Desi Reno; Alison Hudson; Michael Carroll; Steven Carter; Billy Baier; Dan Johnson; Joyesh <br />Chandra; Maria Orozco; Roy Constantino; Manuel Chavez; Greg Scheffel; Marcus Davenport; Jo <br />Baker; Jack Thompson; Diego Chavez; Felipe Maldonado; Wilfrido Garcia <br />Subject: LMRF&TS - ADDITIONAL TIPPING FLOOR REPAIRS <br />M <br />With respect to the current repairs, today the new concrete is being poured. The <br />concrete has a curing period of 25 — 30 days. Therefore, if everything goes as planned, <br />we should be able to utilize the stalls on the commercial side which are currently shut <br />down. To date, the repairs have not negatively impacted daily operations and we've <br />been • •continuetransferring ofwaste• problems. <br />• ♦ �.. * Z 7 <br />Jaime L. Perez <br />• •.WasteOperations • <br />CountyofSanJoaquin <br />Department of Public Works - Solid Waste Division <br />P.O. <br />• • '. <br />Stockton, • '. <br />11/12/2010 <br />