Laserfiche WebLink
Page 2 of 2 <br />Brian Closs <br />Subject: LMRF&TS - TIPPING FLOOR REPAIRS <br />FYI <br />We're planning to start some tipping floor repairs at the LMRF&TS on Tuesday, <br />December 11th. Attached is a diagram which shows the areas. As with past repairs, we'll <br />take the necessary safety precautions by using K -Rails, discussing the project with all <br />staff, and keeping trash and equipment away from those areas, etc. The repairs will not <br />disrupt daily transfer operations and we're confident that we can continue transferring <br />waste within the required timeframe. After the concrete is poured, there is a 28 — 30 <br />days curing period. Therefore, we expect the project to be completed by or before <br />January 31, 2013. Once it's completed, I'll let you know. <br />If you have any questions, please let me know. <br />Thank you. <br />- • zip] V, U-1 <br />- • <br />Jaime L. Perez <br />Solid Waste Operations Manager <br />County of San Joaquin <br />Department of Public Works - Solid Waste Division <br />P.O. Box 1810 <br />Stockton, CA 95201 <br />1/4/2013 <br />