Laserfiche WebLink
Page 1 of 1 <br />From: Jaime Perez [jperez@sjgov.org] <br />Sent: Tuesday, February 05, 2013 7:23 AM <br />To: Natalia Subbotnikova [EH] <br />Cc: Robert McClellon [EH]; Desi Reno; Michael Carroll; Steven Carter; Billy Baier; Marcus Davenport; Roy <br />Constantino; Manuel Chavez; Maria Orozco <br />Subject: LMRF&TS - TIPPING FLOOR REPAIRS <br />Good morning Natalia, <br />Just a quick update on the status of the LMRFTS tipping floor repairs. We're <br />waiting for the final design plan for the remaining section of the tipping floor <br />being repaired. We hope to receive the plan this week. Once we do, the contractor <br />will be able to complete the necessary prep work, which may take about one <br />week. Once the prep work is finished, the concrete will be poured. Based on these <br />timeframes, I anticipate that the concrete will be poured the week of February <br />18th. The cure time for the concrete is 3 — 4 weeks; therefore, we anticipate that <br />we can begin using this area by the week of March 25th.I'll keep you posted. <br />If you have any questions, please let me know. <br />Thank you. <br />Jaime L. Perez <br />Solid Waste Operations Manager <br />County of San Joaquin <br />Department of Public Works - Solid Waste Division <br />P.O. Box 1810 <br />Stockton, CA 95201 <br />2/5/2013 <br />