Laserfiche WebLink
From: Jaime Perez [jperez@sjgov.org] <br />Sent: Monday, March 04, 2013 2:36 PM <br />To: Natalia Subbotnikova [EH] <br />Cc: Robert McClellon [EH]; Desi Reno; Steven Carter; David Gorton; Billy Baier; Marcus <br />Davenport <br />Subject: FW: Emailing: Floor Update 3-4-13 002, Floor Update 3-4-13 003, Floor Update 3-4-13 004, <br />Floor Update 3-4-13 005, Floor Update 3-4-13 006, Floor Update 3-4-13 001 <br />Attachments: Floor Update 3-4-13 002.jpg; Floor Update 3-4-13 003.jpg; Floor Update 3-4-13 004.jpg; Floor <br />Update 3-4-13 005.jpg; Floor Update 3-4-13 006.jpg; Floor Update 3-4-13 001.jpg <br />100 <br />. <br />ti -311 <br />il <br />Cis <br />CIE <br />.. <br />Floor Update <br />Floor Update <br />Floor Update <br />Floor Update <br />Floor Update <br />Floor Update <br />3-4-13 002.jpg (8 ... <br />3-4-13 003.jpg (8 ... <br />3-4-13 004.jpg (7 ... <br />3-4-13 005.jpg (6 ... <br />3-4-13 006.jpg (7 ... <br />3-4-13 001 Jpg (6... <br />Good afternoon <br />Natalia, <br />FYI <br />This past Friday, 3/1, and today, concrete was poured in the tipping floor area in front <br />of the loading chute. Please see attached pictures. We now have to wait for it to cure. <br />Therefore, if all goes well, the concrete should cured in about three (3) weeks and we can <br />begin using the area then. If there is a change in this timeline, I'll let you know. <br />If you have any questions, please let me know. <br />Thank you. <br />TOGETHER WE ACHIEVE THE EXTRAORDINARY <br />Jaime L. Perez <br />Solid Waste Operations Manager <br />County of San Joaquin <br />Department of Public Works - Solid Waste Division P.O. Box 1810 Stockton, CA 95201 <br />P = 209.468.3066 <br />F = 209.468.3078 <br />-----Original Message ----- <br />From: Billy Baier <br />Sent: Monday, March 04, 2013 2:22 PM <br />To: Jaime Perez <br />Cc: Michael Carroll; Stephanie Kong; Steve Mazza (smazza@gseconstruction.com); <br />alankeigley@dentoni.com <br />Subject: Emailing: Floor Update 3-4-13 002, Floor Update 3-4-13 003, Floor Update 3-4-13 <br />004, Floor Update 3-4-13 005, Floor Update 3-4-13 006, Floor Update 3-4-13 001 <br />Jaime FYI project moving right along today. <br />Your message is ready to be sent with the following file or link attachments: <br />Floor Update 3-4-13 002 <br />Floor Update 3-4-13 003 <br />Floor Update 3-4-13 004 <br />Floor Update 3-4-13 005 <br />Floor Update 3-4-13 006 <br />Floor Update 3-4-13 001 <br />1 <br />