Laserfiche WebLink
Page 1 of 1 <br />Natalia Subbotnikova [EH] <br />From: Robert McClellon [EH] <br />Sent: Tuesday, November 29, 2011 8:25 AM <br />To: Natalia Subbotnikova [EH] <br />Cc: Michael Kith [EH] <br />Subject: FW: LMRF&TS - TIPPING FLOOR REPAIRS <br />FYI <br />From: Jaime Perez [mailto:jperez@sjgov.org] <br />Sent: Tuesday, November 29, 20117:01 AM <br />To: Robert McClellon [EH] <br />Cc: Desi Reno; Alison Hudson; Michael Carroll; Steven Carter; Joyesh Chandra; Billy Baler; Maria Orozco; Roy <br />Constantino; Manuel Chavez; Greg Scheffel; Marcus Davenport; Jo Baker; Jack Thompson; Diego Chavez; Felipe <br />Maldonado <br />Subject: LMRF&TS - TIPPING FLOOR REPAIRS <br />Is -- - '..- <br />M <br />Next week at the LMRF&TS week we will begin repairing a portion of the tipping floor <br />about 46' X 106' in size. The work includes removing the existing concrete, placing new <br />rebar, and pouring new concrete. The work will take a total of about two (2) weeks; <br />however, it will take about thirty (30) days for the concrete to cure. As with previous <br />repairs, we will take the necessary safety precautions by blocking off the area with k - <br />rails, making all staff aware of the repairs, and use spotters if necessary. We don't <br />expect any disruptions in daily operations and we'll continue to transfer waste in a <br />timely manner. <br />If you have any questions, please let me know. <br />Thank you. <br />Jaime L. Perez <br />Solid Waste Operations Manager <br />County of San Joaquin <br />Department of Public Works - Solid Waste Division <br />P.O. Box 1810 <br />Stockton, CA 95201 <br />P = 209.468.3066 <br />F = 209.468.3078 <br />11/29/2011 <br />