My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOVELACE
>
2323
>
4400 - Solid Waste Program
>
PR0440013
>
ARCHIVED REPORTS_2010-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2021 4:06:43 PM
Creation date
7/3/2020 11:15:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010-2015
RECORD_ID
PR0440013
PE
4445
FACILITY_ID
FA0001434
FACILITY_NAME
LOVELACE TRANSFER STATION
STREET_NUMBER
2323
STREET_NAME
LOVELACE
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20406020
CURRENT_STATUS
01
SITE_LOCATION
2323 LOVELACE RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0440013_2323 LOVELACE_2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
514
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Label, stating "Contains PCB's" and listing the out of service date. <br />Capacitors will be labeled "Used Capacitors". <br />Storage: Used capacitor containers will be stored in the designated hazardous <br />waste location on site for up to one year, but are typically disposed of every six <br />months. These are placed on a secondary containment pallet. <br />Management and Recordkeeping: Once a month, all accumulated wastes will be <br />sealed in their containers, weighed and logged into the waste accumulation <br />log. The log will be checked to ensure that CESQG accumulation limits have <br />not been exceeded. All wastes will then be transported to the San Joaquin <br />County HHW Facility as CESQG material. The PCB Capacitors are sent <br />through AERC to Lighting Resources, then to Clean Harbors for PCB <br />incineration. A bill of lading will be utilized to transport the Capacitors, and <br />be kept on file. Alternatively, capacitors may be sent to ECS refining for <br />recycling. <br />Refrigerants <br />Identification: Refrigerants are found in refrigerators and air conditioning <br />units. Refrigerant removal will be done as per the C4WMBCDRRR Appliance <br />Recycling Guide and other training documents. <br />Additional Training Requirements: <br />In addition to their current training, employees who engage in removal of <br />refrigerants will be trained in the procedures for refrigerant removal, hazards of <br />the specific refrigerants, and safe handling of appliances to prevent release of <br />refrigerant to the environment. At least one employee is a certified technician <br />under Section 608 of the Clean Air Act. Training will include the following: <br />• Refrigerant identification <br />• Ergonomics and proper lifting/moving techniques (use of dollies and <br />forklifts) <br />• Safe refrigerant removal procedures <br />• Operation and safe use of refrigerant removal tools <br />• Labeling and marking of refrigerant tanks <br />• Hazards associated with fluorocarbons <br />Employees engaged in refrigerant removal will be given 3 days of the on-the-job <br />training with another staff member prior to being allowed to perform refrigerant <br />removal on their own. <br />Removal Procedure: The following procedure will be utilized to remove <br />refrigerants: <br />• Employees will determine the type of refrigerant in the appliance. <br />Appliances will be sorted by type, with, one type evacuated at a time. <br />• The appliance will be positioned such that the refrigerant lines are <br />accessible <br />• The piercing valve will be attached to one side of the compressor <br />• The refrigerant recovery unit is then attached to the piercing valve, and the <br />refrigerant evacuation started <br />• Once completed, the refrigerant unit is turned off, and removed from the <br />piercing valve. The piercing valve is removed from the compressor line. <br />OnSite Electronics 6 Appliance Recycling 2/19/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.