Laserfiche WebLink
EXECUTIVE SUMMARY <br /> TABLE S-1 (Continued) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> LEVEL OF SIGNIFICANCE <br /> ENVIRONMENTAL IMPACT MITIGATION MEASURES AFTER MITIGATION <br /> Public Health and Safety(continued) <br /> GA: Expansion of the transfer station would have the Mitigation Measures Proposed as Part of the Project Less than Significant <br /> potential to encourage or provide habitat or food for vectors G.4a: The transfer station operator shall minimize the <br /> such as rodents,birds and insects. (Less Than Significant) breeding of mosquitoes by minimizing any standing water <br /> throughout the facility;this would be accomplished through <br /> proper grading and drainage. The tipping floor would be <br /> cleared daily to minimize the effect of standing water. If fly <br /> larvae are noted,the area shall be sprayed with appropriate <br /> fly control agent and wet material shall be removed so larvae <br /> will not return. <br /> G.4b: Litter in the tipping area will be picked up on a daily <br /> basis. <br /> G.4c: On an as-needed basis,the transfer station operator <br /> shall have a professional exterminator periodically inspect <br /> and exterminate any identified vectors. <br /> Mitigation Measures Identified in This Report <br /> G.4d: Tires would be stored inside a partially tarped drop <br /> box to prevent rainwater accumulation. <br /> G.4e: The transfer station operator shall use screamers <br /> and/or suspended wires on an as needed basis to reduce the <br /> attraction of birds to the site. <br /> G.4f: If mosquito larvae are noted,the area shall be sprayed <br /> with appropriate mosquito control agent and wet material <br /> shall be removed so larvae will not return. <br /> Siockum Scavenger Transfer Station Expansion S.23 ESA/990190 <br />