Laserfiche WebLink
Health & Safety Plan For Tank Removal <br />Page two of two <br />At the job site, clean fill will bq used to backfill•empty hole <br />after the soil samples have been taken by Me Campbell Analytical, <br />110 2nd avenue. south, Pacheco, Calif, 94553 (510) 798-1620..Soil <br />samples will be excavated using backhoe, samples will be taken two <br />(2) feet to four (4) feet by hand using brass tubes. All of the <br />above procedures will be according to code, Any part not backfilled <br />shall be barricaddd and caution tape will be used. <br />NOTE: <br />Tank hole will be filled completely as soon as soil samples are <br />taken to do the possible traffic hazards. <br />Stockton Service Station Equipment Company Inc., will use proper <br />equipment for each tank removal, No unf ersize or badsmechanical <br />ro �E�rl�� . <br />equipment will be used. All heavy equip PP P 1 <br />'Tanks are to be secured at the assigned location after extraction. <br />Stockton Service Station Equipment Co, Inc. will provide safety hags, <br />goggles and clothing to employees at the job site as per OSHA regu- <br />lation:29 CFR 1910, 120. Caution will be noted that a heat stress siAu- <br />ation may develope when impermeable protective clothing is worn. <br />